The field itself hasn't changed from last week, although there are now some of the black poles installed for the fence to go around the field. Some of the lighting on the pavilion has been done and can be seen on the pavilion link.



March 4th, 2010
More of the black poles have been installed, and some of the fine gravel dumped on the surface.



March 5th, 2010
All the black poles - I think - have been installed around the field minus a couple in this corner where I take the photes. The fine gravel has been spread out over the surface and is being rolled down. Next week is time for the asphalt!