March 10th, 2010
After the storms on the weekend, all the branches that fell onto the ground were removed. The fine gravel was levelled out. There is a pile of gravel on the driveway side for use under the spectator area.



March 11th, 2010
The gravel has been rolled down flat, and the pile on the driveway side moved to the gap between the road and the pitch. Hopefully tomorrow the bitumen may go on!



March 12th, 2010
No bitumen has been laid yet... The edges along the driveway have been leveled out some more.